By The BNN Media
The Best News Network
News Beyond the Borders
Islamabad, Pakistan — The federal government has identified corruption vulnerabilities in 25 federal institutions and proposed around 400 reform measures to fix them, Law Minister Azam Nazeer Tarar announced on Friday. Presenting the findings of the National Risk Assessment of Corruption Vulnerabilities, prepared by the Ministry of Law and Justice, Tarar said the assessment was an exercise in “self-accountability” — not a charge sheet against any institution — aimed at finding weaknesses in the system and correcting them before they turn into financial losses.
The announcement was made at a news conference in Islamabad on Friday, November 20. Tarar joined by video link, alongside Information Minister Attaullah Tarar and Minister of State for Finance Bilal Azhar Kayani. The report was prepared on the special instructions of Prime Minister Shehbaz Sharif, and the government says it will be made public in the coming days, after approval from the prime minister and the federal cabinet.
What the Assessment Examined
The assessment covered 25 federal institutions against more than 300 indicators, drawing on audit reports, regulatory records and findings from investigative agencies. Ten institutions were examined in detail because of the scale of their financial operations and their exposure to possible irregularities.
The institutions named as examined in detail include:
- The Federal Board of Revenue (FBR)
- Pakistan Railways
- Sui Northern Gas Pipelines
- The National Highway Authority (NHA)
- The Benazir Income Support Programme (BISP)
- The state-owned power distribution companies (Discos)
According to the findings presented at the briefing, the assessment found weaknesses in checks and balances, internal controls and the use of discretionary powers — the gaps through which public money can leak. Tarar stressed that the report was not a charge sheet. “We have identified weaknesses within the institution to improve them, how corruption can be stopped, and reforms to make merit and transparency possible,” he said, according to reports of his televised message.
The point of the exercise, as the government presents it, is diagnosis before damage — finding where the system is weak rather than waiting for a scandal to expose it.
Around 400 Reforms in 74 Blocks
The report proposes around 400 reform measures, grouped into 74 reform blocks, with implementation expected to take between two and five years. The measures include digitising government operations, clarifying who is responsible for what, and strengthening financial oversight and accountability.
The government says the report will serve as a guiding document for all relevant institutions and the provinces, which will be able to introduce reforms in light of its findings. Once it is uploaded to the government’s website, it will be available to institutions and provincial governments alike, and the government says progress on implementation will be updated regularly so the public can track it.
Information Minister Attaullah Tarar said the report was aimed at identifying flaws in the system, introducing reforms and setting better, achievable targets. He described self-accountability and transparency as the hallmarks of the governance led by Prime Minister Shehbaz Sharif, and said the prime minister often directed departments to prepare such reports to identify flaws, explore scope for improvement and chart a way forward.
The Figures the Government Cited
At the briefing, the ministers also pointed to results they said the government’s monitoring systems had already produced. Tarar said monitoring systems introduced by the government had produced between Rs100 billion and Rs150 billion in additional tax revenue. He said FBR revenue collection had risen above Rs13,500 billion, and that reforms in the power sector were expected to save Rs3,500 billion. These are figures given by the ministers at the briefing; the full assessment report itself has not yet been published, so the underlying workings have not yet been open to independent scrutiny.
The ministers also cited the FBR’s faceless appraisal system as an example of reform already under way, and Attaullah Tarar said reforms at the FBR and other measures over the past two and a half years had no precedent.

The test of the exercise will not be the announcement, but whether the published report contains enough detail for outsiders to check the government’s progress against its own promises.
A Wider Reform Record
The government presented the assessment as part of a wider record of closing or restructuring bodies it said were linked to corruption and waste of public resources. The institutions named at the briefing included the Pakistan Public Works Department (Pak PWD), where the government said public funds had been embezzled on a large scale; the Utility Stores Corporation, which was shut down, with digital payment systems introduced during Ramazan to provide relief to deserving people; and the Pakistan Agricultural Storage and Services Corporation (PASSCO), which handled wheat procurement and crop management.
Attaullah Tarar said the prime minister had taken these steps despite resistance from within, closing unnecessary institutions solely to ensure transparency. He also pointed to earlier governance measures in Punjab, including merit-based recruitment of teachers from 1997 onwards, and systems such as Safe City cameras and the forensic laboratory, as examples of the same approach.
The government has also pointed to relief on household costs as part of its wider economic record, including the repeated cuts in petrol prices in recent weeks. Whether fuel prices and institutional reform belong in the same conversation is a matter of judgement; the government presents both as evidence of the same reforming direction.
Why This Is Happening Now
The assessment is part of Pakistan’s governance reform commitments under its $7 billion programme with the International Monetary Fund. It follows the IMF’s Governance and Corruption Diagnostic Assessment, published in November 2025, which found widespread corruption risks, weak institutional oversight and governance shortcomings that the lender said were holding back economic performance.
That context matters, because it means the reform plan will be watched not only in Islamabad but by the country’s lenders and international partners. A risk assessment that stays on paper would do little for either audience. The government’s decision to publish the report, and to promise regular updates on implementation, creates a benchmark against which its own performance can be measured — which is, in itself, part of the point of a self-accountability exercise.

What Happens Next
For now, the report remains unpublished, pending approval from the prime minister and the federal cabinet. The government has not yet given a precise date for its release, saying only that it will be made public in the coming days. Further discussions are expected in upcoming cabinet meetings, and the provinces are also taking steps of their own, according to the information minister.
The questions that will decide whether this amounts to more than a well-presented announcement are straightforward. Will the published report name the specific weaknesses found in each institution, or only general themes? Will the 400 measures carry deadlines and named owners? And will the promised public updates actually appear?
Around 400 reforms is a large promise. The public will be able to judge it only once the report is published and the updates begin — and the government has now set itself that test.
By The BNN Media
The Best News Network
News Beyond the Borders
Sources: Dawn; Profit (Pakistan Today); Associated Press of Pakistan; The Pen PK.